Roofed Staircase at the old fortress, made from solid timber.
Timber quantity: 11.4 m3 Production time: 4 working days Assembly time: 12 working days The assembly was extremely difficult, due to the location. It was not possible to use of a crane. All carpentry connections were made the old classical way, secured by a beechen pins. Realization: 2006 Location: Svatý Tomáš |
|
|
|
|
|
|